Skip to main content
»»Das REVIVE Portal · Walkthrough

Submit your project:
track the entire renovation process.

Submit your project, track its status, review pre- and post-measurement data, download the Declaration of Conformity. Everything in one portal. No registration required.

Die Pipeline

Three phases.
Full transparency.

Phase 01

Registration

  • New lead
  • Data captured

Submit the project briefing and upload the required photos of the existing luminaires. Akzentlicht reviews the submission and assigns a lighting expert.

Phase 02

Assessment

  • Cost estimate
  • Sample requested

Binding fixed price per luminaire type. On acceptance, 1–2 existing luminaires go to our lab to serve as the engineering reference.

Phase 03

REVIVE

  • Initial measurements
  • Disassembled
  • Design ready
  • REVIVE complete
  • Final measurements

Measure, disassemble, engineer, print, assemble, post-measure. Once all quality thresholds are met: delivery with a new CE declaration.

Walkthrough

Submit your project
in four steps.

No account required for the first submission. We create one for you on receipt and send the access credentials by email.

Schritt 01

Customer information.

Name, company, email. Phone optional. We ask about your role (wholesaler, design firm, installer, operator) — this helps us pitch the right way.

  • An account is created automatically after the first submission
  • Existing customer? Details are pulled in from your account
revive.akzentlicht.de/submit

Customer information

Please enter your contact details. We use them to create your account.

revive.akzentlicht.de/submit · project

Project details

Tell us about your REVIVE project and where it is.

AKZENTLICHT (Direktkunde)
Anderer Großhändler
Schritt 02

Project details.

Project name, building location, and whether you buy directly from Akzentlicht or through a wholesaler. The location helps us plan delivery and on-site support later on.

  • Wholesaler assignment ensures the correct commission allocation
  • Additional notes: up to 1,000 characters of free text
Schritt 03

Luminaire types.

Up to 10 luminaire types per project. Each type with name, quantity, dimensions, wattage, lamp configuration, colour temperature, control and optionally integration into the safety lighting.

  • Minimum quantity 50 units per luminaire type
  • Fields for colour temperature, sensor systems and emergency lighting integration optional
  • 500 characters of free text per luminaire type for anything specific
revive.akzentlicht.de/submit · luminaires1 of 10 types

Luminaire type 1: T8 trough luminaire (0 units)

revive.akzentlicht.de/submit · photos

Required photos *

At least 4 photos per luminaire type, up to 20 possible. JPG/PNG/HEIC up to 10 MB.

Gesamtansicht
Komplette Leuchte
Interne Elektronik
Ohne Diffusor
Elektrische Komponenten
Verkabelung
Typenschild
Etikett-Nahaufnahme

0 photos uploaded (at least 4 required)

Schritt 04

Upload the required photos.

Four photos per luminaire type are mandatory: full view, internal electronics (without diffuser), electrical components (wiring) and close-up of the type plate. Up to 20 photos per luminaire type possible.

  • Phone photos are fine — the main thing is that details are clear
  • The type plate is the single most important shot for engineering
  • Drag-and-drop or click to browse
Projekt-Übersicht

All projects
at a glance.

After login: all your projects, status, assigned experts and last activity, searchable and filterable.

revive.akzentlicht.de/projectsMK

Projects

40 projects total

Search projects, clients, references…
ProjektKundeZugewiesenStatusLeuchtenAktualisiert
OP-Beleuchtung Klinikum NordwestM. SchmidtAssignNew lead6413.05.2026
Mehrzweckhalle MusterstadtA. MüllerAssignedCost estimate5012.05.2026
Bestandsmodernisierung BürohausL. HoffmannAssignedNew lead5012.05.2026
Verwaltungsgebäude HauptstandortT. WeberAssignedCost estimate20012.05.2026
Sanierung Filialnetz SüdK. BeckerAssignedREVIVE complete12807.05.2026
Qualitätskontrolle

Pre- and post-measurement:
automatically verified.

Every refurbished luminaire is measured twice in the Ulbricht sphere: before the renovation as a reference, then for proof of conformity.

Pre-measurement

Lichtstrom
1.200 lm
Farbtemperatur
4.000 K
CRI
80
Leistung
18,0 W

Uploaded on 28 April 2026

Post-measurement

Lichtstrom
1.150 lm
Farbtemperatur
4.000 K
CRI
84
Leistung
11,0 W

Uploaded on 28 April 2026

Before/after comparison

All passed
MetrikVorherNachherÄnderungStatus
Lichtstrom1.200 lm1.150 lm↘ 95,8 %Passed
Farbtemperatur4.000 K4.000 K↔ 0 KPassed
Farbwiedergabe8084↗ +4Passed
Leistung18,0 W11,0 W↘ −38,9 %Passed
Qualitätsschwellenwerte

Luminous flux retention ≥ 80% · Colour temperature deviation ≤ 200 K · Colour rendering equal or better · Power reduction ≥ 30%

Kommunikation

Chat per luminaire.
Everything documented.

Every question, every image, every note is assigned precisely to the luminaire type, or project-wide. Internal notes (not visible to the client) are also possible, for team coordination.

  • Per luminaire type, discussion thread attached to the relevant component
  • To all luminaires, project-wide messages to all stakeholders
  • Internal only, team notes, not visible to external clients
  • Audit log, every status change with timestamp and responsible party
Projects › Bagusat › Luminaires › Bagusat Bestandsleuchte

Luminaire Messages

SK · DEMO USER · 28.04.2026 · 10:14

First pre-measurement is in the system. CRI a bit lower than expected (80 instead of 84), but we can work with that, the LED module compensates.

AM · ANDRE MAURER · 28.04.2026 · 14:32

Understood. Can we also get the pre-measurement as a PDF for the client documentation?

Enter message…
To all luminaires
Internal only · 0/5000
»»REVIVE Portal

Submit your project:
without an account, in under 5 minutes.

Account sign-up only after submission. Access credentials arrive by email.